NetCycle-R72 Automatic Router Power Cycle Timer for Network Maintenance

No.NetCycle-R72

12H / 24H / 72H Adjustable Timer. Automatic Power Reset. 12cm Power Cable. Metal Housing. LED Indicator.

Käufer-Login – Preise, Bestand und Bestellhistorie

Incoterms® 2020 gelten für alle Tittron-B2B-Bestellungen.

Überblick — NetCycle-R72 Automatic Router Power Cycle Timer for Network Maintenance

12H / 24H / 72H Adjustable Timer. Automatic Power Reset. 12cm Power Cable. Metal Housing. LED Indicator.

Das zeichnet sie aus — NetCycle-R72 Automatic Router Power Cycle Timer for Network Maintenance

  • 12H / 24H / 72H Adjustable Timer
  • Automatic Power Reset
  • 12cm Power Cable
  • Metal Housing
  • LED Indicator

Technische Daten — NetCycle-R72 Automatic Router Power Cycle Timer for Network Maintenance

Model
NetCycle-R72
Garantie
24 months
Zertifizierung
CE · FCC · RoHS
OEM / ODM
Unterstützt

DOWNLOAD — NetCycle-R72 Automatic Router Power Cycle Timer for Network Maintenance

Datenblätter, Treiber und Firmware für dieses Modell. Dateien öffnen in einem neuen Tab.

Häufige Fragen

Q1: What is NetCycle-R72 used for?

The NetCycle-R72 is an automatic scheduled router rebooter. It performs timed power cycling on routers, modems and network devices to refresh hardware operation and stabilise network connections.

Q2: What reboot intervals are available?

It supports three preset cycles: 12 hours, 24 hours and 72 hours for flexible scheduled power reset.

Q3: What does scheduled power cycling do?

It periodically cuts off and restores DC power to your network device, clearing memory leaks and resolving common network freeze issues without manual intervention.

Q4: What are the physical features?

It features a durable metal housing, 12cm power connection cable and LED indicator to show working status. Compact size for easy installation.

Q5: What devices can it work with?

It is designed for DC-powered routers, modems and compatible network hardware.

Q6: What application scenarios fit this rebooter?

Ideal for office networks, remote work stations, smart homes, unattended field network sites and commercial network systems requiring automated power management.

Q7: Does it require complicated configuration?

Simple schedule selection via hardware switch, plug-and-run, no software or cloud setup required.

Benötigen Sie ein Angebot oder ein Eigenmarkenprogramm?

Senden Sie uns Modelle, Mengen und Zielmarkt. Wir antworten mit Preisen, Lieferzeit und Zertifizierungsdetails.

Angebot anfordern